Most of the tests and measurements can also be performed on site by highly qualified GBE staff. Thus the transformer can be verified also directly on the installation site. These are the tests that can be carried out on site:
Check integrity through visual inspection |
Verify the proper operation protection accessories |
Transformation ratio and polarity / vector group |
Measurement of electrical resistances |
Sound pressure in dB (A) |
FRA – frequency response analysis – to verify the mechanical integrity of the core, windings, and the structure of the pressing system |
Oil analysis to discriminate PCB, PCT in ppm with the emission following the removal of any gas chromatography |
Eco 3+ transformers with amorphous core As of 1 July 2021, all transformer manufacturers will have to strictly comply with the production of transformers classified with the term Tier 2, with the exception of specific applications, as laid down in Regulation no. 548/2014 with Phase 2. However, for over 10 years, GBE has been offering […]
ContinueISO 45001 Certification Workplace health and safety: the personnel are the primary wealth for GBE GBE has integrated its IMS system with ISO 45001 certification to ensure safe and healthy workplaces and prevent work-related injuries and illnesses. For many years, GBE has been in possession of ISO 9001 certification related to product quality and ISO […]
ContinueQuay transformers: Shore-to-Ship Respect for the port environment, therefore, reduction of consumption, pollution and noise The regulations in port areas increasingly call for a reduction in the air and noise pollution produced by the ships moored in ports. This requirement is met by using ground power instead of on-board generation during mooring. The shore-to-ship […]