Call us: +39 0444 774334
Follow Us:
  • it
  • en
  • de
  • ru
  • es
  • fr
  • pt-pt

Bunds for oil-filled Transformers

News

Home > Bunds for oil-filled Transformers

Archivi News

  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • Search

    Newsletter

    Subscribe to our newsletter to receive updates.

    A flexible, easy-to-use solution designed by GBE

    Bunds for oil-filled transformers are a new product developed by the GBE steelworks department. For those installations where this bund has not been included, GBE has developed an extremely flexible solution, designed to protect the environment. The oil bund has been developed in pickled and subsequently galvanized metal sheet, in either stainless steel or aluminium painted with polyester products.

    The solution offers high resistance to atmospheric agents and in all environments. The GBE bund can also be supplied with access on the long or short side, depending on client specifications. It features an internal track on which the transformer slides and a removable external kit, which allows the transformer to be inserted inside the bund without any additional or subsequent lifting. The bund’s seal is guaranteed by a cork-rubber gasket. The tank has been designed in line with the same philosophy adopted for all new products, with the aim of offering clients a customised solution that meets their specifications, but above all a complete package.

     

    GBE currently offers seven types of bunds with two variants for the insertion of the transformer. The entire range of power is covered, from 100 kVA until 3150 kVA, however ad hoc solutions can also be developed for higher power levels. For shipping purposes, the bund is supplied with packaging designed to minimise bulk and thus guarantee suitable protection.

    The oil bund produced by GBE has been certified at the TÜV laboratory (Certificate No. MEC16170.00_GBE), offering customers additional peace of mind.

    Test certificate issued by TÜV Laboratory Milan (Italy)

    News

    Supply of transformers to Algeria

    • 2 February 2018

    PUMPING OIL plant built by a leading Italian company in the Oil and Gas industry   GBE SpA has recently completed the supply of 4MVA oil transformers for a prestigious plant for the powering of twin-screw pumps for the Algerian state company. The contract was implemented in collaboration with a major Parma-based company operating in the […]

    Continue

    Hydromatters 4.0

    • 17 October 2017

    Participation of GBE S.p.A. at the hydroelectric conference in Italy   The prestigious annual conference entitled Hydromatters 4.0. recently took place in Padua. GBE SpA with the speaker Eng. Fabio Cavestro illustrated the constructive design used for transformers and reactors subject to occasional, continuous and severe mechanical vibration. During the seminar two types of installation […]

    Continue

    The new GBE House Organ is now online!

    • 8 May 2017

    The third edition of the GBE House Organ includes important accomplishments and supplies from last year, future investments and our partners’ perspectives. For further details, download our House Organ from our website at the link: http://www.gbeonline.com/wp-content/uploads/2014/10/GBE_House-Organ_N3_ING.pdf

    Continue
    © 2014 GBE S.p.A Stabilimento e sede legale: Via Teonghio, 44 - 36040 Orgiano - Vicenza - Italy Capitale Sociale: Euro 1.000.000,00 i.v. P. I.V.A./CF IT02829300249 - REA 278537 - Registro Imprese Vicenza 26501/2000